No.
|
Project list
|
Construction site
|
Construction time start-to -finish
|
Design capacity
|
Plan in 2009
|
Investor
|
Total
|
Including
|
Erection
|
Equipment
|
Other expenses
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
D
|
Projects ready to be implemented
|
-
|
|
|
72.515
|
|
|
72.515
|
|
1
|
Project on compensation for land clearance and other expenses for the project to dredge San Mau stream
|
BH
|
2007-2009
|
|
2.200
|
|
|
2.200
|
Management Board of Rural and Agricultural Development Project
|
2
|
Project to reinforce Dong Nai riverside from Rach Cat bridge to Ghenh bridge toward Cu Lao Pho island
|
BH
|
2009
|
|
800
|
|
|
800
|
Management Board of Rural and Agricultural Development Project
|
3
|
Project on Gia Duc water-storing lake
|
TN
|
2009
|
|
500
|
|
|
500
|
Management Board of Rural and Agricultural Development Project
|
4
|
Project to invest in upgrading Suoi Tre water-storing lake
|
LK
|
2009
|
|
1.300
|
|
|
1.300
|
Management Board of Rural and Agricultural Development Project
|
5
|
Project on Cau Dau water-storing lake
|
LK
|
2009
|
|
500
|
|
|
500
|
Management Board of Rural and Agricultural Development Project
|
6
|
Project on headquarters of Dong Nai province management board of water drainage project
|
BH
|
2009
|
|
1.200
|
|
|
1.200
|
Management Board of Water Drainage Projects
|
7
|
Project on water drainage system from Industrial Park no.1 into Ba Ky Canal
|
NT
|
2009
|
|
500
|
|
|
500
|
Management Board of Water Drainage Projects
|
8
|
Project to invest in antiflood in the areas of Chua stream, Ba Lua stream, Cau Quan stream.
|
BH
|
2009
|
|
950
|
|
|
950
|
Management Board of Water Drainage Projects
|
9
|
Project on land clearance and other expenses for the project to dredge water drainage canal by the end of road no.2-NT.
|
NT
|
2008-2009
|
|
3.000
|
|
|
3.000
|
Management Board of Water Drainage Projects
|
10
|
Project on compensation and other expenses for water drainage route for plant ranges.
|
NT
|
2008-2009
|
|
5.000
|
|
|
5.000
|
Management Board of Water Drainage Projects
|
11
|
Project on compensation and other expenses for water drainage route of road no.2 (form the district centre to the township road no. 19)
|
NT
|
2008-2009
|
|
1.700
|
|
|
1.700
|
Management Board of Water Drainage Projects
|
12
|
Project on water drainage system for the industrial zone and Tan Phu town of Tan Phu district-the first stage
|
1
|
2008-2009
|
|
4000
|
|
|
4000
|
Management Board of Water Drainage Projects
|
13
|
Project on water drainage system for the area of the clear stream in Long Thanh district.
|
LT
|
2008-2009
|
|
4000
|
|
|
4000
|
Management Board of Water Drainage Projects
|
14
|
Project on Gia Mang lake
|
XL
|
2009
|
|
1300
|
|
|
1300
|
Dong Nai Irrigation Exploitation One-Member Limited Company
|
15
|
Dong Nai Centre for Broadcast Technology and Television
|
BH
|
2009
|
|
500
|
|
|
500
|
Dong Nai Radio and Television Station
|
16
|
Project on Long Tan bridge at km 18+437 of the province level road no. 769. Invest in upgrading the township road no. 10 into the province level one. (according to 2010 planning) (stage 1: Upgrade and expand the township road no. 10 from km 1+600 to boundary of Long Thanh district and Cam My district)
|
NT
|
2009
|
|
315
|
|
|
315
|
Dong Nai Road and Water Transport Division
|
17
|
Project to upgrade the township road no. 10 into the province level road. (according to 2010 planning) (stage 2: upgrade and rebuild the route connecting the township road no. 10 from the Cam My and Long Thanh district boundary to the province level road no. 769-the road section avoiding Long Thanh international Airport.
|
NT
|
2009
|
|
300
|
|
|
300
|
Dong Nai Road and Water Transport Division
|
18
|
Project to invest in the township road no. 10 from Cam My district to the National Highway no. 1; upgrade the belt-line road of Division 309 from its front to the National Highway no. 51.
|
NT
|
2009
|
|
200
|
|
|
200
|
Dong Nai Road and Water Transport Division
|
19
|
Project on D War Zone Bridge
|
VC
|
2009
|
|
500
|
|
|
500
|
Dong Nai Road and Water Transport Division
|
20
|
Project on land clearance and other expenses for Xuan Tho Senior High School
|
XL
|
2009
|
1600hs
|
800
|
|
|
800
|
Department of Education and Training
|
21
|
Project on Tan Phu district Ethnic Boarding School (fence, multi-purpose house for 300 students and canteen roof repair)
|
TP
|
2008-2009
|
|
300
|
|
|
300
|
Department of Education and Training
|
22
|
Project on Luong The Vinh high School for the Gifted
|
BH
|
2009
|
850hs
|
300
|
|
|
300
|
Department of Education and Training
|
23
|
Project on Nguyen Huu Canh high school ( with 24 classrooms and sports hall)
|
BH
|
2008-2009
|
|
300
|
|
|
300
|
Department of Education and Training
|
24
|
Project on Nhon Trach high school
|
NT
|
2008-2009
|
1500 hs
|
300
|
|
|
300
|
Department of Education and Training
|
25
|
Nhan Trach district Polytechnic and Vocational Training Centre
|
NT
|
2008-2009
|
1000 hs
|
500
|
|
|
500
|
Department of Education and Training
|
26
|
Project on Xuan Loc Ethnic Boarding School
|
XL
|
2009
|
|
500
|
|
|
500
|
Department of Education and Training
|
27
|
Dinh Quan district Polytechnic and Vocational Training Centre
|
ĐQ
|
2008-2009
|
1500 hs
|
500
|
|
|
500
|
Department of Education and Training
|
28
|
Project on compensation for land clearance and other expenses for the project on the road leading to Thu Bien bridge
|
VC
|
2009
|
|
25500
|
|
|
25500
|
Land Development Centre
|
29
|
Project on Thoai Huong water-storing lake
|
CM
|
2008-2009
|
|
50
|
|
|
50
|
Cam My District People’s Committee
|
30
|
Project on Cam My district Vocational Training Centre and compensation for land clearance and other expenses for improvement
|
CM
|
2008-2009
|
|
300
|
|
|
300
|
Cam My District People’s Committee
|
31
|
Project on Long Thanh district Administrative Centre
|
LT
|
2009
|
|
4000
|
|
|
4000
|
Long Thanh District People’s Committee
|
32
|
Project to upgrade Bau Tre dam
|
LT
|
2009
|
|
400
|
|
|
400
|
Long Thanh District People’s Committee
|
33
|
Project to build Nhon Trach district Politics Training Centre; project on land clearance and other expenses fot upgrading and expanding the province level no. 767 and Vinh An bridge passing Vign An town.
|
VC
|
2009
|
|
2000
|
|
|
2000
|
Vinh Cuu District People’s Committee
|
34
|
Project on compensation for land clearance to dredge deep stream in Vinh Cuu district.
|
VC
|
2009
|
|
4000
|
|
|
4000
|
Vinh Cuu District People’s Committee
|
35
|
Project on road connecting Phan Dinh Phung to Cay Cham Alley
|
BH
|
2009
|
|
200
|
|
|
200
|
Bien Hoa city People’s Committee
|
36
|
Vuon Mit cross-road centre to Cai River axis road
|
BH
|
2009
|
|
500
|
|
|
500
|
Bien Hoa city People’s Committee
|
37
|
Project on Vuon Mit intersection
|
BH
|
2009
|
|
500
|
|
|
500
|
Bien Hoa city People’s Committee
|
38
|
Tan Phu district multipurpose sports Hall
|
TP
|
2008-2010
|
|
100
|
|
|
100
|
Tan Phu District People’s Committee
|
39
|
Project on the road from cultural area to Ta Lai road.
|
TP
|
2008-2009
|
|
100
|
|
|
100
|
Tan Phu District People’s Committee
|
40
|
Project on the road for Dong Nai riverbank collapse prevention
|
TP
|
2009
|
|
100
|
|
|
100
|
Tan Phu District People’s Committee
|
41
|
Project on Thong Nhat district sports centre
|
TN
|
2008-2009
|
|
200
|
|
|
200
|
Thong Nhat District People’s Committee
|
42
|
Project on Phuoc Thai commune flood drainage system
|
LT
|
2008-2010
|
|
200
|
|
|
200
|
Long Thanh District People’s Committee
|
43
|
Project to construct exhibition house and office of sports and culture centre
|
LK
|
2009
|
|
200
|
|
|
200
|
Long Khanh Town People’s Committee
|
44
|
Project to construct Long Khanh town electronic library
|
LK
|
2009
|
|
200
|
|
|
200
|
Long Khanh Town People’s Committee
|