"Project name: Project of exclusive road for construction material transportation in the form of domestic BOT in Phuoc Tan and Tam Phuoc commune, Bien Hoa city."
Competent Government Authority: Traffic and Transportation Department is authorized to implement the project by People's Committee of Dong Nai province.
Construction target: Investing in constructing an exclusive road for construction materials from mines in Phuoc Tan and Tam Phuoc commune, Bien Hoa city.
Construction venue: Phuoc Tan and Tam Phuoc commune, Bien Hoa city, Dong Nai province
Construction scale:
Exclusive road for construction material transportation with total length of 7,489m (including main route and side one)
- The main route is 7,154m long: with roadbase of 9,5m wide; roadbed of 7,5m wide (with 2 lanes, each of which is 3,75m wide)
- Side route is 335m long: with roadbase of 8,0m wide and roadbed of 6,0m wide (with 2 lanes, each of which is 3.0m wide), calculated axle load is 10T.
- Bridge on the route: Building a new bridge named Song Buong 2 whose load is HL93with the length of 33m and cross-section of 4,5m wide
Preliminary total investment:
Total construction investment: 107,147,180,000 Vnd
Competent Government Authority:
Traffic and Transportation Department of Dong Nai province
- Address: 18, Phan Chu Trinh, Quang Vinh ward, Bien Hoa city, Dong Nai province.
- Telephone: 0613.843777 - Fax: 0613.840768
Selection and registration time for interested Investors: from May 25, 2012 to July 06, 2012"