Location:
|
Loc An, Long An and Binh Son commune, Long Thanh district, Dong Nai province.
|
Total area::
|
497,77 Ha
|
■ Infrastructure:
|
|
Transportation :
|
Asphaltic concrete roads with loading capacity from 10 to 12 tons, including:
- Main road: + Type 1: width of road 39 m.
+ Type 2: width of road 36 m.
- Internal road : + Type 1: width of road 28 m.
+ Type 2: width of road 24 m.
|
Power supply:
|
Electricity source is supplied by 220/110KV Long Thanh transformer station and National grid ensuring that supply 22KV electricity source 24/24 hours to the fence of factories.
|
Water supply :
|
Clean water is supplied by Nhon Trach – Thien Tan water plant with capacity 100.000 m3/ day ensuring that supply water 24/24 hours to the fence of factories.
|
Telecommunications:
|
Telecommunication convenient for domestic and international linls including telephone, handphone, fax, internet.....time for support this service from 7 – 10 days
|
Waste water treatment:
|
Water treatment plant for IZ. with capacity 9.200 m3/ day, waste water treatment reach to standard TCVN 5945-2005 colum A.
|
Investment incentive:
|
This is a multiplex IZ. focus on high – technology which have a little environment pollution, priority for high – technology and using high skill labor, some industrial support for the airport activities, warehouse, logistic:
- Industrial of manufacture, assemble electronics, domestic electronics, information technology equipment.
- Mechanical industry, manufacture : accurate mechanics, manufacture machineries, motive power, making and assembling some mean of transport, engines support for agriculture, manufacture machinery, medical equipments.
- Pharmaceutical industry, flavouring. An some industry not polluted environment.
|
Land rental/Infrastructure using fee
( reference)
|
* Land rental fee pay annual year according to regulated of state.
* Infrastructure using fee:
- One time payment: 50 USD/m2/50 year
- Payment annual year: 3,4 USD/m2/year.
- Five year pay one time : 55 USD/m2/50 year
* Management fee : 0,5 USD/m2/year.
(All the cost above are not inclusive of VAT).
|
Power price
|
As regulated of state for voltage 22 KV to 110 KV ( not include VAT)
- The peak time : VND 1.825/kWh.
- The off peak : VND 518/kWh.
- Normal time : VND 935/kWh.
monthly payment
|
water price
|
water price : VND 6.500/ m3.
monthly payment
|
Wastewater treatment fee
(Reference)
|
Wastewater treatment cost is expected : 0,28 USD/m3 (calculated by 80% of clean water used in month)
monthly payment
|